Malting plant control

Plant
Industrial malting plant
Section
Steeping, germination and utility distribution
Scope
From functional specification to trial batch
  • 2steeping vessels
  • 4germination boxes, each with its own air handling
  • 3utility circuits: cooling, process and humidification water
  • 196signals, 184 of them hardwired
  • 8screens, 3 access levels
  • 30alarms in two classes, each with a trigger condition and a system response

Starting point

Operators set valves and dampers by hand, going by the clock and by temperatures read on site. Batch quality depended on the shift, and the refrigeration plant room had no advance notice of the malting plant’s demand.

Goals

  • The batch runs to the technologist’s recipe.
  • Bed temperature holds for five days without intervention.
  • Outside air does the cooling first.
  • A single fault does not stop the batch.

Platform

SIMATIC S7-1500, ET 200SP, PROFINET, TP1200 Comfort panel, Danfoss drives, Endress+Hauser sensors.

Malting-plant control architecture: an operator panel and TIA Portal service access above the S7-1500 controller; on the PROFINET bus, four ET 200SP stations (steeping, germination A and B, utilities) and four frequency converters; the refrigeration plant room connected by hardwired signals.
Malting-plant control architecture. The cooling demand goes to the plant room; availability and a draw limit come back. The diagram labels are in Slovak.

Control functions

  1. Cascade control of bed temperature. The master controller sets the air temperature under the floor; the slave controller reaches it with the dampers and the cooler. Two sensors measure the bed; if one fails, control continues.
  2. Outside air before the cooler. While it is cooler outside than above the bed, cooling uses the ratio of fresh to recirculated air. Only then does the chilled-water valve open.
  3. Managed cooling demand. The malting plant sends its demand to the plant room. When cooling is short, it throttles its own consumers in order of priority; boxes on day four and five are protected longest.
  4. The batch survives a power failure. The program step, elapsed time and batch number stay in memory. When power returns, the system offers to continue and waits for the operator to confirm.

How the project ran

Seven steps from the site survey to operator training.

  1. Analysissite survey, interviews with the process technologist
  2. Specificationsequences, signals and alarms
  3. ProgramPLC and screens, simulation
  4. FATtest with shortened timers
  5. Commissioningevery signal from sensor to screen
  6. SATtrial batch with grain
  7. Handoveroperator training and documentation

HMI

Vessels show the program step and the remaining time. Boxes show the batch day, bed temperature against setpoint, and fan and cooling load. A box with a warning is outlined, with the reason written inside it. The total cooling demand going to the plant room is shown on the right.

  • Overview screen of the malting plant: two steeping vessels, four germination boxes and the utility circuits.
    Overview. The screen is redrawn; values are illustrative.
  • Steeping screen: two vessels with piping, valves and sensors, the steeping program and recipe parameters.
    Steeping. The steeping house drawn the way it is connected, with the steeping program and recipe parameters. The screen is redrawn; values are illustrative.
  • Germination box screen: air handling, the bed, a 24-hour trend, batch data and run conditions.
    Germination. A germination box with its air handling, batch progress and run conditions. The screen is redrawn; values are illustrative.
  • Utilities screen: three water circuits with pumps and valves, cooling demand per box, the throttling order when cooling is limited, and pump rotation.
    Utilities. The three utility circuits with their pumps, cooling demand per box, and the order in which consumers are throttled when cooling is short. The screen is redrawn; values are illustrative.
  • Trend screen: temperatures and actuators over the whole five-day batch, with a cursor.
    Trends. Temperatures and actuators over the whole batch, with values at the cursor. The screen is redrawn; values are illustrative.
  • Alarm and event screen: time of occurrence, class, location, message text and status.
    Alarms. Alarms and events with time of occurrence, class, location and status. The screen is redrawn; values are illustrative.

Result

Steeping and germination run to the recipe with no manual valve or damper adjustments. The plant room knows the malting plant’s demand in advance. A single pump or sensor failure does not stop the batch.

Our role

Automation engineer: functional specification, signal list, program and HMI, commissioning, on-site tests, operator training.

The operator’s name is omitted. Values on the screens are illustrative.